Loading...

DMI Group references

National and international construction projects

Location:

Work carried out:

Rethe lifting bridge – Hamburg Anchor head sealing
New construction of U5 underground line – Berlin Construction pit sealing
Dörverden Lock Building structure sealing
Kö department store undercut – Düsseldorf Freezing boreholes
Leipziger Platz LP 20 – Berlin Construction pit sealing
Söderström Tunnel – Stockholm Subsoil sealing
Wehrhahn suburban railway underground line, Düsseldorf – starting shaft under Kö complex Construction pit sealing
London Cross Rail TBM Reception Sealing block tempering
Friedrichswerder Church – Berlin-Mitte District Stabilisation and elevation injection
GKI with boring-enabled sleeve pipe
Messehalle trade fair hall underground station – Hamburg Sealing of adjacent construction
Ramp at Bilk station – Düsseldorf Concrete cosmetic work
Lloyd Dockyard – Bremerhaven Masonry crack injection
JVS Söderström Tunnel – Stockholm Construction pit injection work
Monbijou embankment- Berlin Drilling work
European Museum – Lübeck Sealing work on anchor heads
Brazilian Embassy – Berlin Cement injection of cracks
Spree cellar of Pergamon Museum – Berlin High-pressure injection work on sheet pile wall
Schauspielhaus Theatre – Düsseldorf Sealing of base plate joint with acrylate gel